Overwatch Mission Critical

    Junior Construction Scheduler

    Overwatch Mission Critical
    Posted 11/12/2025Entry Level
    Full-time
    Construction
    Construction Sequencing
    Primavera P6
    Microsoft Project
    Microsoft Excel
    Power BI

    ⭐ Join thousands of remote professionals with full access • From $4/week

    Job Description

    About Overwatch Mission Critical Overwatch is a service-disabled Veteran-owned small business (SDVOB) certified through the National Veterans Business Development Council (NVBDC), offering construction professional services, talent acquisition, and general contracting for the mission-critical infrastructure industry. Our mission is the construction and management of state-of-the-art data centers with the precision and reliability this industry demands. From high-end engineers to seasoned professionals, we deploy the people you need to get your data center off the ground. At Overwatch, it's more than a job. It's purpose.

    About the Role The Construction Scheduler will serve as a key member of the Project Controls team, responsible for developing, maintaining, and analyzing detailed construction schedules that drive execution, visibility, and predictability across all phases of mission-critical and data center projects. This role requires close collaboration with project management, engineering, procurement, and field teams to ensure schedule data accurately reflects progress, risks, and milestones. The ideal candidate combines deep technical scheduling expertise with analytical rigor—enabling proactive decision-making, alignment between cost and schedule, and mitigation of project risk.

    Key Responsibilities:

    • Assist in developing and maintaining project schedules under the direction of senior scheduling staff.
    • Support the integration of engineering, procurement, and construction activities into a cohesive master schedule.
    • Collect and verify progress data from field teams, subcontractors, and project stakeholders.
    • Update activity status, percent complete, and key milestones in Primavera P6 (or equivalent).
    • Generate weekly and monthly schedule reports and dashboards for review by project leadership.
    • Participate in look-ahead meetings to align field activities with the master schedule.
    • Track and document schedule changes, delays, and impacts for analysis and reporting.
    • Assist with schedule risk assessments and forecasting exercises.
    • Learn to perform critical path and variance analyses to identify potential impacts.
    • Maintain as-built data and support project closeout documentation.

    Core Skills & Competencies:

    • Basic understanding of construction sequencing and the relationship between trades and project phases.
    • Foundational knowledge of Primavera P6, Microsoft Project, or similar scheduling software.
    • Proficient in Microsoft Excel; experience with Power BI or data visualization tools a plus.
    • Strong analytical and organizational skills with attention to detail.
    • Effective communicator who can collaborate with project engineers, superintendents, and subcontractors.
    • Eager to learn, proactive, and able to manage multiple priorities.
    • Demonstrated interest in project controls, scheduling, or cost management.

    Experience & Qualifications:

    • Prior experience on large commercial or industrial projects preferred; data center or mission-critical experience a plus.
    • Familiarity with Primavera P6 (training or certification preferred).
    • Understanding of earned value concepts, critical path, and schedule logic preferred but not required.
    • Strong desire to grow into a mid-senior level scheduler or project controls analyst role.

    Physical Requirements and Work Environment:

    This position may operate in a combination of office, remote, and active construction site environments, depending on project assignment and business needs. Employees must be able to perform essential job functions safely and effectively in both professional and field conditions.

    Must be able to walk, stand, stoop, twist, bend, and climb stairs or ladders for extended periods while navigating uneven, unpaved, or obstructed terrain when on-site. Must be able to lift, carry, push, or pull up to 50 pounds on an occasional basis. Must be able to travel to and between job sites and access all areas of an active construction zone, including raised platforms, scaffolding, and confined spaces. Must be able to tolerate outdoor weather conditions and exposure to dust, noise, vibrations, and construction-related odors. Must be able to communicate effectively with contractors, engineers, and other personnel while maintaining situational awareness in high-activity environments. Personal protective equipment (PPE) such as hard hats, safety vests, hearing protection, and steel-toe boots are required when visiting or working on active construction sites. This role requires visual acuity sufficient to read drawings, specifications, and safety signage, and to observe site activity.

    Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions of this position in accordance with applicable law.

    Know someone who’d be a great fit? If you're a current Overwatch employee and want to refer top talent to help us grow, submit your referral HERE. Let’s build the future together!

    Benefits:

    Overwatch Construction offers a competitive salary and benefits package, including health insurance, dental insurance, vision insurance, life insurance, 401(k) retirement plan, paid time off, and relocation assistance available.

    OVERWATCH is committed to creating a diverse work environment and is proud to be an Equal Opportunity Employer. OVERWATCH considers candidates regardless of race, color, religion, sex, sexual orientation, gender identity, national origin, disability or veteran status.

    💼 Want More Jobs Like This?

    Get similar opportunities delivered to your inbox. Free, no account needed!

    Similar Jobs You Might Like

    Utopia logo

    Quantity Surveyor/Cost Estimator

    Utopia
    Not specifiedabout 3 hours ago
    Full-time
    Cost Estimation
    Budgeting
    Scheduling
    Cost Control
    Material Analysis
    Utopia logo

    Quantity Surveyor/Cost Estimator

    Utopia
    Not specifiedabout 3 hours ago
    Full-time
    Cost Estimation
    Budgeting
    Scheduling
    Cost Control
    Materials Analysis
    Utopia logo

    Quantity Surveyor/Cost Estimator

    Utopia
    Not specifiedabout 3 hours ago
    Full-time
    Cost Estimation
    Budgeting
    Scheduling
    Cost Control
    Material Analysis

    Project Information Coordinator

    PlanHub
    Not specified1 day ago
    Full-time
    Communication
    Prospecting
    Sales Skills
    Computer Proficiency
    Organization

    Want to see all 25,571 jobs?

    You're currently viewing 1 out of 25,571 available remote opportunities

    🔒 25,570 more jobs are waiting for you

    Unlock All Jobs

    Access every remote opportunity

    Advanced Filters

    Find your perfect match faster

    Daily Updates

    New opportunities every day

    Save & Alerts

    Never miss an opportunity

    Weekly
    $4
    Perfect for quick searches
    POPULAR
    Monthly
    $12
    Best for active job seekers
    Yearly
    $48
    Save 67% • Best value
    Unlock All 25571 Jobs

    Join thousands of remote workers who found their dream job

    Frequently Asked Questions

    What's included in premium access?

    Premium members get unlimited access to all remote job listings, advanced search filters, job alerts, and the ability to save favorite jobs.

    Can I cancel anytime?

    Yes! You can cancel your subscription at any time from your account settings. You'll continue to have access until the end of your billing period.

    Do you offer refunds?

    We offer a 7-day money-back guarantee on all plans. If you're not satisfied, contact us within 7 days for a full refund.

    Is my payment secure?

    Absolutely! We use Stripe for payment processing, which is trusted by millions of businesses worldwide. We never store your payment information.